Renovirai.com offers construction consultations from proven expert designers in the field of construction interventions on existing buildings. The first stage of each consultation is the site visit and its initial visual assessment. The results of the visit aim to determine the next necessary activities to achieve a positive end result. The team also prepares the necessary technical documentation for each stage of the construction and investment process

Preliminary determination of current status by a design engineer
Based on a comprehensive inspection of your building structure, available construction documentation for it and after a thorough analysis, the current and predicted state of the structure is determined. According to BDS EN 1998-3:2005, there are three levels of information KL1, KL2 or KL3. In case of damage to the structure, its limit state LS is determined according to BDS EN 1998-3 (Pre-failure – NC, Significant damage – SD and Limited damage – DL).

The Renovate team also inspects and completes projects outside of Sofia.
For the purposes of the inspection, it is necessary to provide access to the maximum number of rooms in the building, including basements, cellars. If there are cracks, it is good to have access to them open. The inspections aim to trace their path and nature of formation. Providing available documentation for the building can also provide useful information to the designer.


Device study

At this stage, the client assigns the designer a spatial study that provides clarity on the parameters of development and other legal restrictions related to the construction project. The information collected serves as a preliminary assessment of the compliance of the investment intention. The goals set by the client are synchronized with the real legal limits for the specific site.

Legal advice
The specifics of construction activities on existing buildings require in-depth knowledge of the regulatory framework in construction. Often, underestimating the possible problems associated with a reconstruction that affects foreign interests leads to judicial resolution of disputes. Anticipating these difficulties at an early stage can largely prevent possible obstacles to the implementation of the project.
